ALLEGRA office building
Luxembourg
Construction of an administrative building in Leudelange. Located in the industrial estate, the project consists of two staggered volumes connected by a central circulation line. Overhangs allow covered outdoor terraces for the building's users. The office building has 4 levels above ground and 3 basement levels. The floor plans are open plan, allowing for flexible and variable office modulation according to the respective needs of the users.
Key figures:
- 5,500m² area
- Opening date: 2022
Central power supply systems, emergency and safety lighting from RP Group were installed in the entire building complex. In total, over 300 RP products were installed:
- 165 luminaires from the IL series
- 100 escape sign luminaires from the ASMU series
- 65 escape sign luminaires from the KSU series
- 35 luminaires from the QBW series
- 1 central power supply system MN series